Most office buildings are to be cut off, if the time interval to to the
top, will change to smoke and spray, and property companies usually require
owners or the decoration company to solve, if so to find the qualified fire fire
company, the company in accordance with the provisions and approval the local
fire department for approval, this time is usually 10~15 days. (some office
property department can also solve the problem of fire)
In the same office decoration to partition to divide the space, then into
account each space to retain the central air-conditioning air outlet and the air
return quantity, so that the same need to find a regular qualified central air
conditioning installation company. Decoration in the office before the
transformation of the central air conditioning must first plan to hand in the
layout of the property company and the audit. After the completion of the
project, the property company also asked to produce a central air conditioning
project completed.
Strong and weak electricity engineering office decoration works in the most
important point, because it is related to the normal work of the entire company,
so it can not be ignored. The first is to find a professional qualified cabling
company, professional and technical personnel to the scene of the actual
measurement, the reserve of strength of electric switches, sockets and a variety
of lines to reflect the planning drawings, and then submitted to the audit and
the property company.
Office furniture in the office decoration before trying to find a good
furniture company, because most office needs office high partition, many lines,
the socket should be connected with the partition, so the furniture company must
have a close connection with the electrical engineer, drawing the best from the
two parties jointly determined after to get the property company audit.
Design is good or bad; four words: drawing war. But the advice to you boss
is that the technology is so advanced, with computer renderings of it, sometimes
drawing things tend to two times better than reality. I think the computer can
only show the effect of a 3D way of understanding it, and can not think that it
is the effect of decoration. Design is good or bad from the design style is
desirable, drawings and design is reasonable, and so to understand.
Construction quality; visit the quality of the other model room. According
to the present situation, it seems that the two model room to reflect the level
of the construction side: home decoration and hotel decoration. Because only the
quality of these two can be seen in the quality of the level of.
The high and low cost; the most painful choice. High quality and cheap
fixed, but this is often not in the reality of logic. Cost is the first
guarantee of quality. If funds allow, the construction team will choose a good
reputation to save you a lot of unnecessary trouble.
Payment method。 This problem seems to be difficult. General private
decoration, regardless of size, the construction team are very willing to
undertake. This is mainly a small risk, but for the company's decoration,
decoration team are very cautious attitude. As long as this is the collection is
very difficult. Coupled with the project fraud in the last few years, the peer
has become very clear, not easily lured by high returns.