For most people, the image of the city to stay at the building above a
edifice, make the city more and more commercialized, make the economy more and
more prosperous. Work building is a beautiful scenery in the city, is the
workplace every day work occasions. Thus, the overall planning office units
decorative planning is particularly important. Unit decoration planning is not
as simple as home decoration, unit decoration has some complex and subtle
decoration projects. So decorative units should pay attention to the following
elements to ensure that the unit can be safely used after decoration.
Whether traditional state-owned enterprises or international multinational
companies are still their own small companies on the needs of the unit
decoration planning is not the same as the planning ideas and planning
personality planners are not the same. But one thing is the same, today's
customers are no longer a simple planning program. They need more time is short,
quoted in the budget, planning quality advanced elements summed up the best
plan.
Our unit decoration needs tailored, usually in units of time planning
decoration will not damage once the original plan, and then consider the unit
decoration is not used in the space interval, the size of it is very good for
future work to control the equipment space reserved for have to think in, also
thinking of planning personalized decoration.
施工要素:注主要全功能
Construction elements: note the main full-featured
The working space in the selection of decorative construction army special
needs careful, let Yang rich unit planning decoration decoration more than and
10 years of experience, the construction site quality and management skills,
well-equipped, exquisite workmanship, excellent style, can act as different
grades, different size, different types, different personality decoration
engineering.
The ceiling is the main unit of decoration: decoration should pay attention
to in the unit is at the top of the ceiling some, indoor space is usually high,
and most of them is steel structure, to plan fire, ventilation, and central
air-conditioning in the reasonable arrangement of the top decoration, because
these are the necessary hardware building decoration, especially is the
fire.
Next is the basis of using the request to make sure that it is the problem
of the ceiling, ceiling workshop information many, if something can be used for
mineral wool board, gypsum board, aluminum plate and other materials to the top
decoration, can not do any ceiling, at the top of the demand is hiding or some
devices do not beautiful part of the polish is a modern, minimalist program.
Unit or building decoration decoration here about the unit decoration, pay
special attention to the safety function, including fire safety sprinkler
system, and the construction unit selection and so on, is not in laying the
foundation for the quality of the project. Decorative planning quality
clearance, it basically put an end to some small problems caused rework
costs.